← index · meeting page · Granicus video · Agenda PDF

Committee of the Whole — 2026-02-02

Decision notes (reviewed)

Written by the reviewer from the ASR + docket; [verbatim-ASR] = quoted machine transcript; [paraphrase] = reviewer's wording, not a quote.

Per agenda item (official Granicus index → ASR evidence)

0:30Approval of the minutes of the January 26, 2026 Committee of the Whole.
Motion type(s) spoken: — · ASR heard “motion passes”
  • 0:35 “Second.”
  • 0:36 “The motion's been made and seconded.”
  • 0:41 “All those in favor?”
  • 0:43 “And that motion passes.”
0:50Communication from President Kepple regarding City Hall Space Considerations Amended Schedule (referred to COW 01/05/26)
Motion type(s) spoken: — · no passage phrase heard by ASR
    0:52Communication from President Kepple regarding City Hall Space Due Diligence Update (referred to COW 10/20/25)
    Motion type(s) spoken: — · no passage phrase heard by ASR
      0:55Communication from Mayor George regarding presenting the Administration's case for relocating to downtown Lakewood: 1470 Warren Road. (referred to COW 1/5/26)
      Motion type(s) spoken: — · no passage phrase heard by ASR
      • 10:40 “for someone if they didn't have a second project.”
      • 18:42 “whether it's on the first floor or the second floor,”
      • 19:10 “Second floor?”
      • 19:18 “Second floor, this is where you have the break room”
      • 24:09 “are the second generation JGJ.”
      • 26:33 “So those are all second nature to us also.”
      • 28:22 “on the second floor, right?”
      • 34:22 “and then you move into the more secluded second floor.”

      Full ASR transcript

      0:00 All right.
      0:01 All right.
      0:02 We'll call a committee to hold an order.
      0:03 Apologies, everyone.
      0:04 My laptop started doing updates right before I left, so I had to negotiate with IT to get
      0:09 it back.
      0:10 So, which is a reminder, they asked me to pass along, so councilmembers, after we
      0:15 go home tonight, please plug into your laptops and leave them on, so IT can do those
      0:22 updates.
      0:23 All right.
      0:24 So, first move to approve the minutes of the January 26 Committee of the Whole without the
      0:34 necessity of a reading.
      0:35 Second.
      0:36 The motion's been made and seconded.
      0:39 Discussion?
      0:40 Hearing none.
      0:41 All those in favor?
      0:42 Aye.
      0:43 And that motion passes.
      0:44 Okay.
      0:45 So, our main item tonight is to do a conversation about the City Hall space considerations,
      0:52 and I will turn it over to Chief Story, I guess, to get us started.
      0:57 Thank you, Madam President.
      0:59 I'm John Story, Mayor George's Chief of Staff.
      1:03 I don't have the name tag, but I want to, first of all, thank the president leadership
      1:11 for, again, continuing this dialogue, this conversation.
      1:14 I know as you plan ahead, month ahead on, or even more so, many times on scheduling
      1:20 these things.
      1:21 It's hard to herd sheep or whatever, and tonight we unfortunately drew Silie, one of the main
      1:30 guys who we've been working with quite closely, he came down with the flu.
      1:33 So we're dealing with that, but luckily the team, we have some out of town guests
      1:37 who've driven into town.
      1:38 We have the entire Liberty development team here, and we'll be excited to introduce
      1:44 and I'll have Tom do the presentation of his team to you guys so you know who's
      1:48 in the room.
      1:50 I just want to kick off with this, and then next week, our goal, our aim, and what we're
      1:56 endeavoring to do, David Boss is in the back, our team in the mayor's office as
      2:01 well as others in the planning and finance, we're all aggregating and doing everything
      2:05 we can to compile a list of questions and comments that have been said and to try
      2:10 to get answers and to synthesize the data in a way that is moving the ball down
      2:17 the field.
      2:18 Obviously this week we'll be working a lot on this, and if anything comes up or you
      2:23 want to speak to us or the development team, have at it.
      2:27 This is the time to do it.
      2:29 So with that said, if you would like me to introduce Tom, I'll do so.
      2:32 That would be great.
      2:34 Come on up Tom, thank you.
      2:42 Green means go, I learned that when I was a little kid.
      2:45 Thanks John.
      2:46 Thank you Madam President, Council, feels like yesterday we were all together,
      2:50 doesn't it?
      2:51 And it almost was yesterday.
      2:54 Thank you for meeting with us again today.
      2:57 And I think the last time we were together I was a little bit unsure of where I was
      3:03 supposed to go with it, but today I feel like I got a much better understanding
      3:07 of our role here is to let you know where we're coming from, give you any
      3:12 information that we have, and make sure you understand our team.
      3:15 So we made, just to give the history that we all know, we bought the
      3:22 buildings and we had a couple of projects we were working on.
      3:26 One of them was significant with First Federal of Lakewood to keep them here.
      3:30 That took us two years and frankly COVID killed that.
      3:33 Working on other projects and during that time you talked with the city and
      3:38 it was brought up to us that would we consider selling these or doing
      3:43 something with City Hall because they were working on the issue that they're
      3:46 working on.
      3:48 Which, you know, we kind of have the institutional mind, that's a lot of
      3:51 what we do.
      3:52 So this is very comfortable for us in having these conversations.
      3:55 So I feel like over time we'll be able to connect on whatever, because
      4:00 that's how I look at it, right?
      4:02 You're sort of that institutional mind trying to take care of a very large
      4:05 organization.
      4:07 But it made sense to us.
      4:09 So that doesn't mean it makes sense to everybody.
      4:12 We have had an opportunity to be able to speak to you clearly about this project
      4:19 because we've had a hell of a lot more time, effort, and investment in this
      4:23 project than you have or anybody else, frankly, starting with the renovation of
      4:28 the smaller building, which is 10,000 square feet, which you can go touch,
      4:32 walk through, talk to tenants, take a look at at least the finished level
      4:35 that we liked.
      4:37 We've also owned these buildings a long time and have had the
      4:40 opportunity to discover a lot of what would normally be a surprise in a
      4:44 renovation project.
      4:46 So we've been able to dig through walls and take open ceilings and do things
      4:50 that you don't do if you're just buying something for renovation.
      4:53 So that's another thing that when I spoke to you about being excited about
      4:58 this, we don't always get that opportunity to know these things.
      5:03 The team that I'm going to introduce you to, this is not the first time
      5:07 we've worked together.
      5:09 The first time that we worked together was renovating the Bulkley Building in
      5:15 downtown Cleveland with Playhouse Square.
      5:17 It started with a relationship of mine, and you start talking about things,
      5:20 and ultimately, I said to Drew, we need to find the best architect,
      5:26 meaning the architect that has done more conversions or historic tax credit
      5:32 office building type projects around.
      5:35 And we found a Berardi in Columbus.
      5:39 They actually have a Cleveland, their Cleveland roots are from here.
      5:42 George Berardi, who founded the firm, is from Cleveland.
      5:45 Didn't know that.
      5:46 We actually had a lot of people in common that we knew.
      5:48 And anyway, we ultimately hired them to be the architect.
      5:52 And I'm giving you some information about this so you know this isn't a
      5:55 haphazard team that we've put together.
      5:58 So with Playhouse Square, the board there is the who's who of real estate
      6:03 and investment people in Cleveland.
      6:05 And we're working with Art Falco, who's now retired,
      6:08 the CEO for decades.
      6:10 And we proposed doing what we do quite often, which is to build a team.
      6:16 We should interview them.
      6:17 They didn't know who we knew, and they didn't know who we knew.
      6:21 So we went out to four companies that had,
      6:24 this is the construction of things now,
      6:27 a history of successful projects doing historic tax credit buildings
      6:31 in downtown Cleveland.
      6:33 Had not worked with J.G.J., John G. Johnson before,
      6:37 although I knew Mike Weber because he lives in Lakewood.
      6:40 His wife and my wife are friends, but we'd never worked together.
      6:42 They won that contest through meetings and a lot of conversation about
      6:49 where this could go, getting their ideas.
      6:51 So ultimately, though, we built a team and we renovated that building.
      6:55 There were two other projects going on that were not in our control.
      7:00 One of them was Dixon Eaton on the top floor, which is office.
      7:04 And that was being done by Playhouse Square initially.
      7:07 And then I think it was Whiting Turner was going to finish it.
      7:10 And then Playhouse Square was redoing the elevators,
      7:12 big project and the facade of the building.
      7:15 When that project got started, it was very confusing, right?
      7:22 You got contractors trying to take priority over things
      7:26 and how are we going to get the buck hoist and all these things.
      7:28 I got a phone call from Mike Weber who said,
      7:31 Tom, this is going to go very, very badly
      7:33 if you don't put somebody in charge.
      7:36 And I'll never forget that conversation.
      7:38 He said, I'm going to do it.
      7:40 I'm not charging you for it,
      7:41 but we need to make sure this is a successful project.
      7:44 He did that.
      7:45 He had great respect from Whiting Turner, Playhouse Square,
      7:50 and everybody else that worked on the project.
      7:52 And there was total cooperation with everybody.
      7:56 And it got done on time, on budget.
      7:58 All the projects, not just our project.
      8:00 Ours was the largest of the whole thing, which made sense.
      8:02 That's why we would take it over.
      8:04 So building number two that we worked on
      8:06 was the Lakewood Board of Education building.
      8:09 And terrific partners from the beginning.
      8:11 We worked together.
      8:12 Ideas.
      8:13 Somebody has an idea.
      8:15 Somebody else throws it.
      8:16 I mean, this isn't an architect in charge of all the architecture
      8:19 and the contractors in charge of all the contracting.
      8:22 They have different perspectives from what they do.
      8:24 And sitting at the table together,
      8:26 they get along better than a family at Christmas time.
      8:31 We sit down.
      8:32 We figure it out.
      8:33 So I want to introduce you to those folks.
      8:34 But I needed to give you the background.
      8:36 This isn't a team that hasn't worked before.
      8:37 It was vetted pretty well.
      8:39 And when we were given the opportunity to come to the city
      8:43 with a proposal that, and there could have been 10 others,
      8:47 whatever, but from our perspective,
      8:49 what could we do to satisfy the issue the city had,
      8:53 which was with our buildings?
      8:55 I think I told you I would have loved it.
      8:57 I tried to rent it.
      8:58 They just don't seem to have any interest in that,
      9:00 but it's always on the table for what it's worth.
      9:02 But I like the way it fit.
      9:03 Everything made sense to me.
      9:06 And hopefully it will to you, too.
      9:09 It was from a lot of experience in the buildings,
      9:11 knowing what we have,
      9:13 knowing what we have to do to them to accommodate
      9:16 the most stringent buyer, tenant,
      9:19 whatever we had to do.
      9:21 So I guess the point I'm bringing up about owning it
      9:25 is because that's generally how we do things.
      9:29 We try to build a portfolio and keep it,
      9:32 send it.
      9:33 That's part of what we're doing.
      9:34 We don't do anything short-term.
      9:36 We don't just turn things and sell them.
      9:39 We're not merchant builders.
      9:40 I brought up Cozumel,
      9:42 because we built that for IHOP 25 years ago.
      9:49 To own something like that in Lakewood is incredibly rare.
      9:54 Why sell it?
      9:55 If Cozumel wanted to buy it, I wouldn't sell it.
      9:57 So it's giving you some perspective on why,
      10:00 where we're coming from and what we're trying to do.
      10:03 I'm pretty good at some of this stuff,
      10:05 but the kind of letting you know the feelings
      10:08 and where I'm coming from.
      10:09 But we are really good at getting a project done on time.
      10:12 We've done it for university hospitals, very tough.
      10:15 Cleveland State, and they're our tenant and partner.
      10:17 We're still with them.
      10:19 Kohl's department stores, Walmart, Target, you name it.
      10:23 And these people are about as tough as you can get
      10:25 in terms of scrutinizing our product.
      10:28 I'm only telling you that because this is my opportunity
      10:31 to let you know we're not just doing a project here,
      10:35 a project there.
      10:36 We've been doing this for 30 years.
      10:38 And I don't think we've ever done a project once
      10:40 for someone if they didn't have a second project.
      10:42 They didn't ask us to come back.
      10:44 We've paid all our bills.
      10:45 You won't find a contractor out there saying
      10:47 we didn't come through.
      10:49 And I'm proud of that.
      10:51 I've had the same partners for 30 years.
      10:53 I'm proud of that.
      10:54 So hopefully you'll get a chance to hear
      10:56 what's being proposed here,
      10:58 get a chance to talk to our team,
      11:00 and get comfortable with that.
      11:02 Don't assume that that's going to end the questions.
      11:04 I expect you'll have a lot.
      11:06 Everybody comes from a different perspective.
      11:09 But know that what you're going to see,
      11:11 we had an opportunity,
      11:13 and I think Variety did most of the work,
      11:15 to interview these departments and find out,
      11:18 what do you need?
      11:19 Who do you talk to?
      11:20 It's a program, which I know some of you
      11:22 are pretty familiar with, maybe not all of you,
      11:24 but they call it a program.
      11:26 Just tell me what you need.
      11:28 How many square feet?
      11:29 Are you tall?
      11:30 Are you growing?
      11:31 Are you shrinking?
      11:32 And who do you deal with the most?
      11:33 So what you see is not a first pass,
      11:35 but quite a bit of work has gone into this floor plan.
      11:38 Doesn't mean it has to be the final floor plan.
      11:40 We don't have fixtures picked out.
      11:42 We used the same finishes that we would have done
      11:45 in the other building.
      11:46 So if you want to see what we were using in here,
      11:48 you could look at that.
      11:49 That doesn't mean it has to be that.
      11:51 That's where we work together, too.
      11:53 So I don't expect this to be the end.
      11:55 But I'm happy to answer any questions now
      11:57 or I can come back later.
      11:58 But I think the best next group to talk to you is Berardi.
      12:03 Missy and Joe Berardi are here from Columbus.
      12:08 They have an office in Cleveland,
      12:10 so they're not always driving back and forth.
      12:12 And then after that, I would ask Mike Weber
      12:15 and Anthony Valensik from JGG
      12:17 to talk a little bit about how this works.
      12:19 We can keep that short.
      12:20 Hopefully I'm the longest-winded one.
      12:22 But do you want to ask me anything first
      12:24 or it's your meeting?
      12:29 I think let's keep going
      12:33 unless council members have...
      12:35 Okay.
      12:36 Terrific.
      12:37 Missy and Joe Berardi.
      12:40 Missy from Columbus.
      12:42 Berardi Partners, the architects.
      12:49 Thank you, Tom.
      12:50 Thank you, Madam President.
      12:52 Thank you, Council.
      12:54 Can you hear me?
      12:57 I'm Joe Berardi.
      12:58 I am with Berardi Partners.
      13:00 We are an architecture firm.
      13:02 We also have engineering and house.
      13:04 A lot of our primary focus is historic rehabs,
      13:07 which is one of the focuses that I have.
      13:10 I've been in the firm that was started by my uncle
      13:15 for about 15 years now.
      13:17 A lot of the work that we've done over the years
      13:20 is just built on a lot of relationships
      13:22 that we've built throughout the history of the firm,
      13:25 which dates back to 1979, so we're about 46 years old.
      13:31 The relationship with Tom goes back many, many years
      13:34 by chance, and then a lot of what we've been doing
      13:38 with Liberty Development has been tied
      13:40 to the Bulkley Building and the Lakewood School.
      13:45 A lot of my history within the firm
      13:47 also ties back to my relationship with the SHPO office.
      13:50 So I've actually worked with SHPO.
      13:52 I've been a third-party consultant.
      13:54 We've done numerous historic projects throughout the state.
      13:57 Here recently, we've been working on the West Side Market,
      14:00 where we were the design architect
      14:02 that submitted for the original NPS Part 2,
      14:05 which was approved and turned it over to DLR
      14:09 and have remained a partner with the project.
      14:12 We are also working on the Artcraft Building,
      14:15 both projects that I've been actively involved in,
      14:18 and also been working on the Rose Building,
      14:22 which is at the corner of Prospect and 9th.
      14:25 So my history is really tied into a lot of the historic rehab
      14:29 throughout the city of Cleveland and surrounding areas.
      14:35 I'm Melissa O'Spires.
      14:36 As you said, I'm a project executive
      14:38 and director of operations at Verardi.
      14:40 I've been there about nine years,
      14:42 and I was the project manager on the Bulkley Building project
      14:45 that Tom was talking about earlier with John T. Johnson.
      14:48 And I've worked on all these other projects
      14:50 that Joe mentioned as well.
      14:58 So a lot of our concept for the project
      15:01 was based on conversations we had with Drew Seiley,
      15:04 who unfortunately is not here.
      15:06 But the focus was really trying to preserve
      15:09 the historic integrity of the school.
      15:12 So one of the components that we talked about was,
      15:14 you know, what is kind of the most important part of this?
      15:17 As you're driving north and south on Warren,
      15:19 we really wanted to focus on
      15:21 trying to maintain the historic integrity.
      15:27 So a lot of the discussion was, you know,
      15:30 while this is not a historic tax credit project,
      15:33 what can we do to really clean the building up?
      15:36 It's a lot of landscaping.
      15:38 It's really minor repointing, cleaning, new windows,
      15:42 and really trying to bring it back
      15:44 to its historic character.
      15:47 One of the pieces that you'll see just beyond the entrance,
      15:50 beyond the main entrance off to the side
      15:52 is this new modern awning with glass structure.
      15:56 So what we tried to do was incorporate
      15:58 this new light transparent component
      16:01 that serves as the main entrance into the building.
      16:04 The philosophy behind that,
      16:06 and this again is just a conceptual design,
      16:09 but the idea was to kind of create this open atmosphere,
      16:13 something that's very inviting for the public
      16:15 so that as you're driving up the drive,
      16:18 it signifies not only the main entrance,
      16:21 but the opportunity to enter into a very public realm
      16:25 within the city hall.
      16:27 If you jump to the next slide.
      16:30 This is just a better view of the main entrance
      16:33 that we designed with the awning,
      16:35 and you can also see kind of the site plan.
      16:38 So we're adding parking to the front,
      16:40 restriping and regrading the back.
      16:42 So it's really trying to create this very pedestrian
      16:45 kind of walking environment, very inviting.
      16:49 We're trying to also create this very accessible entrance
      16:52 into the building,
      16:53 something that the original historic structures
      16:55 really struggled with.
      16:58 Next slide.
      17:00 So this is the main floor plan.
      17:02 There is a grade elevation,
      17:04 so the main entrance lobby is kind of that space
      17:09 in the middle.
      17:10 It's got the double doors along with the vestibule.
      17:13 As you enter into that space,
      17:15 that's where security sits,
      17:17 and then off to the right,
      17:18 I think it's a little hard to see,
      17:20 but off to the right,
      17:21 there is a concierge desk,
      17:23 which will allow any customer
      17:25 or public facing occupant to come in,
      17:29 check in,
      17:30 and then there's an elevator just beyond,
      17:34 along with the stairs,
      17:35 so that provides full access into the building.
      17:37 So we're really trying to create this open environment,
      17:40 really try to create this very dynamic space
      17:43 that allows for the public
      17:45 to kind of come in and interact with any public official.
      17:50 As you kind of walk into the space,
      17:52 you also feel secure as a building occupant,
      17:55 somebody that works in the space.
      17:57 There's always a security guard.
      17:59 The police department will actually have an office
      18:02 on the main level with the window that looks down,
      18:05 so it kind of plays into the security.
      18:08 As you enter into the main area,
      18:10 I'm sure you get up the stairs and the elevators,
      18:13 this is what we really defined
      18:15 as the public portion of the project.
      18:18 So this is the building department,
      18:20 this is public works,
      18:22 vital statistics and water, finance.
      18:26 So the idea is to kind of keep this open,
      18:29 kind of allow occupants to kind of enter in,
      18:34 experience the space, they can get in there,
      18:37 talk to the officials that they need to.
      18:40 Each department will also,
      18:42 whether it's on the first floor or the second floor,
      18:44 we're trying to create equitable spaces,
      18:46 so conference rooms, offices, gender-neutral bathrooms,
      18:51 so if you have a mother that's nursing,
      18:55 there's opportunities for somebody to have privacy
      18:58 as they're pumping.
      19:02 So the idea again is try to keep this as open,
      19:06 but secure it as you walk through the first floor.
      19:10 Second floor?
      19:12 Next page?
      19:16 Okay.
      19:18 Second floor, this is where you have the break room
      19:21 that sits above the entry lobby.
      19:24 You have city council chambers with a small assembly space,
      19:28 which opens up into the rotunda,
      19:30 which is this really nice historic space.
      19:33 Large volume, we've got the historic stairs
      19:35 that kind of lead down to the first floor
      19:37 and also provide exit.
      19:40 We also have the mayor's chambers
      19:43 along with the law director,
      19:44 so we were really playing around with the adjacencies.
      19:47 A lot of those conversations happened with Drew Seiley
      19:50 and the various departments within City Hall.
      19:56 This would be a much more private, I guess, floor,
      19:59 so the public would try to keep things at the public
      20:02 or customer service needs
      20:04 were more on the first floor,
      20:06 and then this would be more important for staff.
      20:18 So a lot of this is trying to respect the historic nature
      20:22 both on the inside and the outside,
      20:24 but the reality is with the partitions,
      20:26 with the finishes that we're looking at,
      20:28 this is going to feel like a brand new space.
      20:31 We're really trying to just upgrade the opportunity
      20:34 to take a historic building
      20:36 and really put in brand new use into it
      20:39 and kind of look at this building as,
      20:42 which was originally constructed in, I think, 1899
      20:48 and give it another 50-year-plus lifespan.
      20:51 So we believe this is really taking a very sustainable approach
      20:56 because we're not demoing it.
      20:58 We're looking at this as an opportunity
      21:00 to bring new life into it,
      21:02 and this is really at a crucial juncture in the city,
      21:06 and it's really kind of centered very nicely.
      21:11 Did you explain that the first, that building,
      21:13 there are actually two buildings they put together,
      21:15 1899 and 1907.
      21:18 So one of the things that we noticed
      21:20 when we were doing all of this,
      21:22 and I think it's so cool, and again, I go that route,
      21:25 and I know you'll stop me if I go down the wrong way,
      21:27 but if these, you could tell they had more money
      21:30 when they built these buildings than we did,
      21:32 than they did in the small one
      21:33 that we had already redeveloped.
      21:35 The ceiling heights, the windows are much larger.
      21:39 The design, like that octagon over there,
      21:41 that, you know, they just did things in this building.
      21:44 They spent, you could just tell,
      21:46 even that relative dollars.
      21:48 These buildings are, they're beautiful,
      21:51 and if, with the right use, not functionally obsolete,
      21:54 something like this.
      21:55 Now, there's not a very strong office market.
      21:58 You know, you can't, it just isn't,
      22:00 and we've all been reading about that,
      22:01 so this is a use that, in a stronger market,
      22:05 there'd be a lot of opportunity to do that.
      22:07 There's less opportunity in today's market,
      22:09 but this is a great showing you,
      22:11 if somebody who needed this square footage,
      22:13 how well it fits.
      22:14 This isn't something anybody's married to.
      22:17 This is something I would fully expect.
      22:19 I'm guessing, has anybody seen this before,
      22:22 or is this the first time?
      22:23 I think you're seeing it for the first time, aren't you?
      22:25 I don't know that, but...
      22:28 I think it would be the first time
      22:29 for most councilmembers, yes.
      22:30 Yeah, yeah, so, you know,
      22:32 I'm sure you're just trying to figure out
      22:33 what those departments are and everything,
      22:35 so as you digest it,
      22:37 you're gonna have your own thoughts on how this stuff works,
      22:41 and maybe somebody else will, too.
      22:43 But from what we know now, this is a workable,
      22:45 this is what we're basing all of our proposal on the price.
      22:51 So we would build, you know, this design,
      22:53 your finishes, and what you want done to the building.
      22:56 This doesn't show HVAC, you know,
      22:59 we have our own system planned.
      23:01 Your building department might say
      23:02 they like something different, you know, whatever.
      23:04 There could be a number of changes to it
      23:07 that are floor plan or intrinsic components of the building.
      23:13 But the suggestion, too, that we turn it around
      23:19 would be based around this floor plan
      23:21 and the entrance way with the elevators
      23:23 and, you know, all the sort of accents and stuff.
      23:27 So, I don't, again, I don't know
      23:32 if you want to ask us anything now,
      23:36 but the pricing of all of this,
      23:38 so to give you an idea of where we,
      23:40 would really be best described by JGJ.
      23:43 They do a lot, I mean, their company's doing
      23:45 over $100 million a year
      23:46 and a lot of this type of work.
      23:48 But more importantly to me, they've done it for us
      23:50 and we've been under budget.
      23:52 So, I feel, and I'm very comfortable
      23:54 with how much they've spent a lot of time on this
      23:56 back when it was first federal of Lakewood
      23:58 and this plan, so they know these buildings
      24:00 probably better than I do, and I know them pretty well.
      24:03 So, if it's okay with you, I'll bring it.
      24:06 Let's introduce, so Mike Weber and his brother
      24:09 are the second generation JGJ.
      24:12 Mike Weber's, you know, his kids and my kids
      24:14 go to school together, Lakewood resident.
      24:16 Anthony, we kind of like Anthony
      24:18 probably because he's smarter than Mike,
      24:20 but I won't say that on a public record.
      24:22 So, yeah, nice to meet you.
      24:24 I'm Mike Weber.
      24:25 I'm one of the owners of John G. Johnson.
      24:27 Anthony's actually an owner also.
      24:29 I handle the director of construction,
      24:32 vice president construction.
      24:34 I oversee operations.
      24:35 Once a job becomes a real job.
      24:37 And Anthony Valenzic here,
      24:39 he handles the pre-construction budgeting
      24:42 and helps with the design teams
      24:44 in terms of establishing budgets and estimates.
      24:47 Yeah, look, Mike probably hasn't walked
      24:50 through this building too much,
      24:51 but I've spent, as Tom said,
      24:53 since 2018 helping out First Federal Lakewood.
      24:56 I walked through with a couple of residential developers
      24:58 to look at multifamily.
      25:00 I spent, you know, a couple of years
      25:02 renovating the building next door,
      25:04 the smaller building.
      25:05 When we say we have an understanding
      25:07 of what's hidden in all these walls and floors,
      25:10 I've personally crawled around an attic up there
      25:12 and looked at everything.
      25:13 So I have a really good understanding
      25:15 of what it takes to renovate this space.
      25:19 The cost we are presenting is very valid
      25:22 because we've got several active projects
      25:25 of similar types.
      25:26 People always get concerned about renovations
      25:28 and the unknowns that go into them.
      25:30 For us, it's about getting a hands-on experience,
      25:33 looking at all of the unknowns,
      25:35 the possibilities, the risks
      25:36 that come up with renovating it.
      25:38 Mike and I are currently under construction
      25:41 on a project in downtown Cleveland.
      25:43 We're turning 46,000 square feet
      25:45 of an old building that was put in place in 1940.
      25:50 We've gutted it down to the studs.
      25:52 Very similar cost per square foot structure
      25:54 that we're talking about here.
      25:56 It's a process that we know.
      25:58 Municipal work for our company.
      26:00 We've done work with Eastlake,
      26:02 City of Worcester, Strongsville.
      26:05 Am I missing a couple?
      26:07 Quite a few.
      26:08 Yeah, I'm sure.
      26:09 On the municipal side of our business
      26:11 is something we feel very strongly about.
      26:13 We've been around since 1943.
      26:15 So everything you guys have already heard
      26:17 about our team with the way Tom has described it
      26:20 much more eloquently than we can.
      26:22 But if there's any questions related to cost
      26:24 or the project, have me to answer them.
      26:27 I think we're very familiar with
      26:29 the prevailing wage, compliance, union agreements.
      26:33 So those are all second nature to us also.
      26:40 Thank you.
      26:41 Council members, questions?
      26:47 Do we have more presentation
      26:48 or are we at just question part?
      26:50 No.
      26:51 I think we're at the question part.
      26:52 So, you know, we really, this is,
      26:55 we appreciate your time,
      26:56 and it seems like we were invited
      26:58 to come in and talk to this about.
      26:59 So we wanted to show you what the proposal was
      27:01 and then just have any dialogue you want.
      27:04 So this is where, I would say
      27:05 we're at the dialogue part, yeah.
      27:09 Okay.
      27:13 So I guess one first question that I have is,
      27:18 you know, with this site plan
      27:19 and you're saying about the finishes could change,
      27:21 you're not married to any of the layout.
      27:24 So how do you come up with the pricing
      27:29 then if things aren't finalized?
      27:33 Well, so I think this is a terrific baseline,
      27:36 by the way.
      27:37 This was done, just we didn't come up with this.
      27:39 This was done interacting with the folks
      27:41 that work for you and work with you.
      27:43 So I, not to, I mean, anything can change
      27:46 and then you have to sit down
      27:47 and you draw it and you price it out again
      27:50 and then you talk about it.
      27:52 You know, as an example,
      27:53 if you said to me, Tom, you know,
      27:56 that office is way too big down there.
      27:58 We want to put it, we want to divide it into two.
      28:00 Then we price out a wall
      28:02 and the paint that goes with it
      28:04 and the flooring that goes with it
      28:05 and the HVAC ducts that change with it
      28:07 and whatever we're doing with it
      28:09 and we give you a price.
      28:10 It could be something,
      28:13 you want to be able to walk on the,
      28:16 so the lobby when you walk in,
      28:18 you know, that, I at one point said,
      28:21 what a great place to put a little patio
      28:22 on the second floor, right?
      28:24 If you wanted to do that,
      28:25 then you do different loads.
      28:26 We have the engineers in house.
      28:28 We calculate the difference
      28:29 and what would that cost to do it?
      28:31 And we tell you.
      28:32 And then you folks,
      28:34 I would expect you folks would say,
      28:36 you know what?
      28:37 That's worth it because or it isn't.
      28:41 We have a specific HVAC heating
      28:44 and cooling system in here.
      28:47 We did a project
      28:48 or worked on a project with Baldwin Wallace.
      28:50 They absolutely did not like what,
      28:52 this was not this architectural firm,
      28:54 but some colleges really like a certain,
      28:57 it's a high velocity system.
      29:00 They had problems with it.
      29:01 So they did not want to use it.
      29:02 So we had to go back
      29:03 and have our mechanical engineers redesign
      29:07 a different system for them
      29:08 because that's what they wanted.
      29:09 And I think what they wanted was actually
      29:11 a little bit less money,
      29:12 but it lasted,
      29:13 or I can't remember if it was less money or more money,
      29:15 but that's the way the process would work.
      29:17 You would say to us, you know,
      29:20 we would like to change,
      29:21 we don't think that this is big enough
      29:22 or that's too big
      29:23 or we don't need this space
      29:25 or we need, could be anything from that to finishes,
      29:29 you know, we want all mowing.
      29:32 Then we could go with all mowing
      29:34 and we've priced that.
      29:35 But what we have in here is a really good baseline
      29:37 and you don't know what that is yet.
      29:38 So when you know that,
      29:40 then you'll be able to respond to us and say,
      29:43 this is something that we think you're overdoing,
      29:45 you're underdoing,
      29:47 but it's going to be a really good baseline for you.
      29:52 Okay.
      29:53 Council members?
      29:55 Council members, too big.
      29:57 Thank you.
      29:58 I have, actually, I have a couple of questions.
      30:01 Can you talk a little bit about the survey,
      30:04 any of you, including Mr. Storey,
      30:06 can you talk a little bit about the survey
      30:08 that was done with the staff and their needs
      30:13 and what you found there?
      30:15 Does it seem like we're increasing,
      30:17 like they're tight on space
      30:19 or, oh, they could probably use the same amount of space
      30:22 or, wow, they really have a whole lot of space
      30:24 that they're not even using over there?
      30:27 So I thought Verardi did that,
      30:29 but Drew did it mostly because he used to work here
      30:31 and I think he knew everybody.
      30:33 But John, do you know how those interviews went
      30:35 or how that went?
      30:36 Because it's pretty specific in here.
      30:38 I can speak on a high level.
      30:39 I didn't sit in on all of them.
      30:41 I sat in on a few of them,
      30:42 but it was essentially around Robin.
      30:46 I don't know if you want to take over, Angie,
      30:48 because you may have been in more.
      30:50 Go ahead.
      30:51 Thank you, Council.
      30:52 So, yeah, Mr. Stiley met with each department individually,
      30:57 got a count on how many employees were there,
      30:59 and just asked what their specific needs were.
      31:02 For example, asked the building department
      31:04 what kind of style do you like to have arrangement,
      31:07 and the building commissioner says
      31:09 he likes to have an open floor plan.
      31:11 So those kind of conversations occurred.
      31:14 They walked the building to look at what was where
      31:17 and the sizes, but basically asked
      31:20 how many desks do you need?
      31:23 What's your storage?
      31:24 What kind of storage do you need?
      31:26 The building department has transferred
      31:27 a lot of stuff over to digital,
      31:29 so they don't need as much space anymore
      31:31 as they've had in the past.
      31:33 So they were pretty much,
      31:34 they were high level conversations,
      31:36 but I think they gave enough information
      31:38 to allow them to design something
      31:40 that would meet the needs of what we have now
      31:44 and provide a little space, a little extra space.
      31:47 So we know the building is larger
      31:49 than what the administrative side has right now,
      31:52 but we are still doing the calculations
      31:54 that Councilwoman Strievig has asked for
      31:56 in regard to each department and what the increase is.
      31:59 So we will have that for you at the next meeting.
      32:01 Can I just add one thing too?
      32:02 I think this dovetails as well off
      32:04 before Angie's time here
      32:05 when Weber Murphy Fox first came on the scene,
      32:08 there was the same exact high level
      32:11 and then the focus on a department by department basis,
      32:15 which was the basis for their original report.
      32:18 So to me it was kind of a handing of baton
      32:22 from that original report to the Liberty folks.
      32:26 Thank you.
      32:27 I am interested in that because we talk obviously
      32:31 a lot about making sure that our female police officers
      32:36 have a space right now
      32:40 that really they don't have a space
      32:43 to do their jobs the best.
      32:46 And so we're also concerned about that
      32:49 because we want to recruit,
      32:50 and we've talked about this with the chief,
      32:52 the very top of the line people for that department.
      32:56 And I also think that that's important
      32:57 for every department in the city, right?
      32:59 So when we start to look at new spaces
      33:03 for the law department and the building department
      33:05 and the planning department and every other,
      33:07 the finance department and every other department,
      33:10 are we giving those folks the same importance
      33:17 with their space?
      33:18 I guess I'm also looking for like
      33:20 what kind of upgrades are they gonna get
      33:22 in addition to maybe space?
      33:24 Or if they don't need more space,
      33:26 are they getting better access to, I don't know,
      33:31 internet or whatever amenities that they would need?
      33:36 Go ahead.
      33:38 I just want to address two items.
      33:41 The other part of this was that,
      33:43 as part of those conversations,
      33:44 we went through various plan iterations,
      33:47 and we really were strategic about the adjacencies
      33:51 between the different departments,
      33:53 and those were part of the discussions as well.
      33:55 So it wasn't just isolated to head count.
      33:58 It was the mayor having direct access to the law director.
      34:01 It was the building department having direct access
      34:05 to the planning department.
      34:06 So it goes above and beyond just the head counts
      34:10 or the square footages.
      34:11 So we were trying to be very strategic
      34:13 and really methodical about how we were trying
      34:16 to address the different adjacencies
      34:18 and making sure that the public facing components
      34:21 were all on the first floor,
      34:22 and then you move into the more secluded second floor.
      34:26 And then the other part of the conversation
      34:29 that we really tried to strive for
      34:31 was trying to create equitable spaces
      34:34 that are never going to be fully equal
      34:36 just based on the dynamics of the historic building,
      34:39 the way the walls hit,
      34:41 the different components within the mullions,
      34:44 the windows,
      34:45 but we're trying to create equitable spaces
      34:47 for every department so that there's a lay down area.
      34:50 There's kind of like a workspace
      34:53 with a coffee machine or a copier.
      34:56 So we're really taking a lot of different ideas
      35:00 and trying to take different approaches
      35:02 to try to create these spaces
      35:03 that try to be as equal as possible.
      35:08 Conference rooms,
      35:10 access to the different amenities within the space,
      35:13 the break room,
      35:14 adding the elevators so that it hits all the floors.
      35:17 So there was a lot of time and effort that was spent
      35:19 trying to strategically locate these things.
      35:22 So it was easy to navigate through the spaces.
      35:25 Sorry.
      35:26 Very good.
      35:27 One thing too is as they work through the design,
      35:29 they'll do phase reviews.
      35:31 So everything doesn't all of a sudden,
      35:33 you're stuck with something.
      35:34 They'll do like 25% drawings,
      35:36 50% drawings, 75%.
      35:39 Everybody gets a shot to take a look at the drawings
      35:42 as they go.
      35:43 So you can make adjustments with whoever
      35:45 as the design goes along.
      35:48 So that was the process,
      35:50 and it's a pretty standard process.
      35:52 It really does start with talking to people
      35:54 and hearing what they have to say,
      35:56 having some experience knowing that sometimes
      35:58 people will ask for more than they need
      36:00 or some people are afraid to ask for anything
      36:02 so they don't ask for enough.
      36:04 And an office function,
      36:06 we've been involved in municipal projects.
      36:09 You have a pretty good idea of what somebody's going to need
      36:11 in terms of space.
      36:13 So that's right.
      36:14 And I don't know how you ultimately,
      36:18 whether there's going to be meetings like that,
      36:20 if this is something that you decide is a good fix
      36:23 and you want to continue to do it,
      36:24 I don't know whether it's going to be in this meeting
      36:26 or if you form a committee to sit down
      36:28 and review where we're at during those 25, 50%.
      36:31 You know, however you want to do it,
      36:33 be a part of the process, you'll know.
      36:36 But the other thing that you don't see just lines,
      36:40 you have to imagine yourself walking into this building.
      36:42 And with this, this should help you a little bit.
      36:44 Like, hey, I'm going to...
      36:45 You can kind of picture walking through here.
      36:48 The thing we don't talk about enough,
      36:51 but the quality of life, it changes everybody.
      36:55 People that when they like going to where they're going to work.
      36:58 So that is something you will consider as we're designing this.
      37:01 If you think we've missed it on some point,
      37:05 that it really will be a test of how well this project works,
      37:10 all the folks that work here, how they feel.
      37:13 Awesome. Thank you.
      37:14 My second question is, can any of you talk to me about parking,
      37:18 which of course, as you know, as liquidates,
      37:20 you know that parking is a premium here.
      37:22 So can you talk about the number of spaces that you're going to add there?
      37:28 John, do you know the exact number?
      37:30 I know that we have...
      37:31 I have it here somewhere.
      37:32 So there's a site plan on here.
      37:35 Is it on here?
      37:36 Can I?
      37:37 Okay, good.
      37:38 So there's a site plan.
      37:40 So not using historic tax credits,
      37:42 which is probably the right thing to do here.
      37:44 Because sometimes historic tax credits cost you more than they're worth.
      37:50 One of the things that you can do immediately,
      37:52 not using tax credits, is the parking lot out front.
      37:56 And there's a parking lot that you already own,
      37:58 that you have access to, that's behind Starbucks,
      38:02 that's not on this site plan.
      38:05 I know my friend, George Anthony, who has this property across the street.
      38:09 I think he offered even more parking, but we are on a bus line.
      38:12 So I don't know the number either.
      38:13 I didn't count it before we came.
      38:15 But I know we have quite a bit of adjacent parking,
      38:18 and then quite a bit down the street.
      38:20 If the schools would let you park, then you've got unlimited parking,
      38:23 because that grant is right behind us.
      38:25 I shouldn't say unlimited, but much more than that.
      38:28 I think if we left the schools out of it though,
      38:30 if you could give me a number of how many spaces are there now,
      38:34 and how many will we have when this project,
      38:37 if this project goes through, if this is the way we're going to go.
      38:40 So I'm hearing it's almost 70.
      38:41 I think it's 66 to 70 spaces.
      38:43 Okay, great.
      38:44 And then my last question.
      38:46 On site.
      38:47 Thank you, Chair.
      38:48 I notice that you have the gender-neutral restrooms,
      38:54 and I'm wondering if this is an industry standard now.
      38:57 I'm sorry?
      38:58 The gender-neutral restrooms, is this an industry standard now,
      39:01 or is this something that you're doing because we are liquid?
      39:06 I think I don't know exactly why we're doing it here.
      39:09 I don't know that it's standard.
      39:10 I think it's pretty common.
      39:11 It's becoming more common whether it's just,
      39:14 I don't know if it's a cost issue or people are driving it,
      39:17 but I know that that's in the plan here.
      39:21 So I see it in a lot of places though.
      39:23 Yes.
      39:26 Through the Chair, I want to get back to a question you asked two ago.
      39:30 To answer your question, I'm not speaking to this,
      39:32 but absolutely this is intentional.
      39:34 It's one of the things we've been focusing on,
      39:36 understanding the concerns and the questions about the gender-neutral
      39:41 bathrooms and for sure in a facility that we're going to inhabit,
      39:45 that's an A1A.
      39:46 So as it relates to this project,
      39:48 it's been right out of the chute what we've been planning for.
      39:52 As it relates to your previous question,
      39:53 and this is an important one because I think it speaks to how we got here,
      39:57 and we've gone over this for almost a year and a half now.
      40:01 The initial Weber Murphy Fox study was conducted to try to solve the
      40:05 police problem.
      40:06 And what I mean by that is we knew we had a spatial deficiency.
      40:11 It was from that report where we realized that the cost there,
      40:14 in our opinion,
      40:15 the cost to remedy such situation didn't really truly fully assist
      40:21 or capture what we needed to do on a global basis to help all
      40:25 employees.
      40:26 And the ones that come to most of mind,
      40:28 and Renee can speak to this,
      40:29 is obviously over in the annex and the fact that we have literally
      40:34 people in what would otherwise be closets and many other city halls.
      40:38 And the mayor did not think that was right.
      40:40 And the mayor decided at that moment to pivot and to try to look at
      40:44 a more global encompassing solution at whatever level of cost it
      40:48 might be to figure out what is doable.
      40:52 The tightrope walk as always, and we face this,
      40:54 Angie and I face this in Sandusky as well,
      40:57 is you have the fact that you want to build the best project you
      41:01 can to attract and retain the best employees you can,
      41:06 but you're also using taxpayer dollars.
      41:09 And it's a unique set of circumstances that anybody who works in the
      41:14 public, private or nonprofit sector that is using taxpayer dollars,
      41:18 it's always paramount in your mind.
      41:20 So I just want you to know that there was never treating one
      41:24 department above another or JV level of varsity.
      41:28 It was never like that at all.
      41:29 It was always the mayor's intent and her push and the aim that drove
      41:34 all of us here collectively was focused on that to make sure that
      41:38 whatever we ended up with,
      41:39 it was a darn good ending for our employees and for the citizens of
      41:43 Lakewood.
      41:44 Thank you.
      41:45 Thank you, chair.
      41:46 For what it's worth,
      41:47 I don't know that we were ever told what to do is really,
      41:50 could you help get what would you do?
      41:52 And that's where the interviews came in from and so forth.
      41:54 And so I don't know how much back and forth on that design there
      41:57 was, but I think most of that was on our end to,
      42:01 to suggest what needed to be done.
      42:03 But I'm not sure.
      42:05 When were those interviews conducted?
      42:07 It's been a little while now.
      42:08 So they, they could probably be a year ago.
      42:12 I mean,
      42:13 the Webber Murphy Fox ones go back several years because Sean
      42:16 Leininger was the driver.
      42:18 I you'll have to remind me cause I wasn't involved in all of them.
      42:21 But when Angie came on board.
      42:24 Yeah.
      42:25 I'll have to look at the calendar.
      42:26 I'd say.
      42:27 Last calendar year.
      42:28 Nine, nine months ago.
      42:29 Maybe just like some.
      42:30 I feel as like there was longer than that.
      42:32 That drew, did the interviews, our interviews.
      42:35 Yes.
      42:36 Anyway, not two, three years, but not six months.
      42:40 Okay.
      42:41 And then, so we would own the,
      42:44 the product of Webber Murphy Fox.
      42:46 We've seen the,
      42:48 we've seen the space study, you know, renderings.
      42:51 I'm not sure if we have the entire product from them in the shared
      42:55 folder.
      42:56 It probably is in terms of.
      42:59 Cause I know David's all from Webber Murphy Fox had.
      43:04 Done a potential rearranging here to try to make things better.
      43:08 And then that was still not quite, you know, not quite it.
      43:13 But then there was the talk about the small build out for the
      43:16 police potentially.
      43:18 And as we've been going through this.
      43:20 But we would own that entire project, but we don't own the.
      43:25 It's your work product, right?
      43:27 That would with doing the interviews and all of that
      43:31 information would be owned by Liberty.
      43:33 Is that correct?
      43:35 We don't own anything, right?
      43:36 We all come into this world and go out and leave it all behind
      43:39 us.
      43:40 Look, it's funny.
      43:42 I was thinking about Kyle's question about.
      43:47 Why the pressure and who's putting on pressure and all.
      43:50 And it's, it's kind of like dating, you know, you want to keep
      43:53 dating as long as they answer the phone and say, yeah,
      43:55 Saturday night's great.
      43:56 And they start saying, ah, so look, all of this stuff.
      44:00 If we're really working together not to do it, I'm not asking
      44:03 that.
      44:04 But if we're working together to find out if this is a great
      44:07 solution and ultimately the best solution.
      44:10 There's no, there's nothing being, there will be nothing that
      44:13 you can't have.
      44:14 That's not an issue.
      44:16 There was a little bit of a closed, you know,
      44:19 you're closing yourself off a little bit when you think you're
      44:21 going to go compete with the world.
      44:23 And we know more than anybody else.
      44:25 I'm not going to go, the Browns aren't going to go give
      44:27 the Falcons their playbook.
      44:29 We have a pretty good playbook.
      44:31 And it's really, we've had a lot of time to deal with it.
      44:33 But that doesn't, that's not you.
      44:35 We're not on two sides of a table negotiating with each
      44:38 other.
      44:39 We're trying to figure out, does this really work for you?
      44:42 And that comes down to this council and representing the
      44:45 city and whether or not you believe that that's right.
      44:48 My opinion is just an opinion.
      44:50 I've been doing this a while.
      44:51 I'm excited because I think you're going to come,
      44:53 but I don't know that, right?
      44:54 So anything I have that you need to know to make those
      44:57 kinds of decisions, there's no, it's not about ownership.
      45:00 I kind of, you know, that's not something we should be
      45:03 looking at.
      45:04 Sure.
      45:05 I do feel like we need to look at that just because as
      45:09 we make this decision and we're thinking if we were to not
      45:13 go with this building, then all of that data and all of
      45:17 that knowledge, and we wanted to go with a different
      45:20 solution, we would be starting over with those
      45:23 interviews again.
      45:25 So I do think it's something that we need to think
      45:27 about, you know.
      45:28 Yeah.
      45:29 That's something that people aren't pretty accustomed
      45:31 to doing if you wanted to take a different route.
      45:33 That's not the hardest part of all of this.
      45:35 You know, sitting down with everybody is,
      45:37 it's actually quite eye-opening sometimes.
      45:39 Sure.
      45:40 And sometimes good to do that once in a while.
      45:42 For sure.
      45:43 I see Council Member Hamilton-Steiner had a question.
      45:45 Yes.
      45:46 Thank you, Madam Chair.
      45:48 So I want to go back to the parking because this was
      45:50 something that I did have a resident last week reach
      45:53 out and had questions about the parking situation.
      45:56 And maybe this is a tag team.
      45:58 The administration needs to also provide a response.
      46:01 Is it safe to assume that there is the plan to have
      46:06 one parking space per employee on site and an
      46:10 additional four, you know, residents or visitors to
      46:16 City Hall?
      46:17 Or is the plan that there is not going to be enough
      46:21 parking for both visitors to City Hall and City
      46:26 Hall business, meetings, people that come through,
      46:30 and employees, and employees would have to park
      46:34 elsewhere, and that would need to be secured.
      46:37 So you're asking a really complicated question,
      46:40 and I love that.
      46:41 It's great.
      46:42 And every city that you would talk to or township is
      46:45 going to have a different response.
      46:47 Lakewood should be a lot different than, I don't
      46:51 know, some farm town, right?
      46:55 I don't know the count of people that actually,
      46:57 I don't know that every employee drives here.
      47:00 Public transportation is a big deal.
      47:02 Walking is a big deal.
      47:03 That's part of this.
      47:04 You know, the other piece in the back of my mind,
      47:06 I alluded to it the last time, was the walkability
      47:09 and what does this do for downtown Lakewood,
      47:11 right?
      47:12 You could, you know, those bus lines that cross
      47:14 there, I don't know how many people are coming
      47:16 along those bus lines.
      47:17 So parking is important.
      47:18 I don't think that this site was designed to a
      47:21 specific standard.
      47:22 It was designed to show what we could do on
      47:24 site.
      47:25 Lakewood is the most densely populated city, I
      47:28 think, between New York and Chicago.
      47:30 It's really tough.
      47:31 You could do structured.
      47:32 But, you know, then that gets into quite some
      47:34 big dollars.
      47:35 Parking is important because there's been
      47:37 times when I've come and I've been jiving
      47:39 around waiting and I think Maureen ended up
      47:41 leaving one day and I grabbed her spot or
      47:43 someone I knew was leaving and I grabbed
      47:45 their spot as I'm coming here to do, you
      47:48 know, council business.
      47:49 So I would argue that parking, if this is
      47:52 going to be the solution that we decide on,
      47:55 parking needs to be part of that solution.
      47:59 And if that has not been thought about, I
      48:01 think that is a big sort of, oh, we forgot
      48:04 about parking.
      48:05 We forgot those considerations of that.
      48:08 So I think we need all of that.
      48:11 For sure.
      48:12 No, parking has been a very significant
      48:14 part of these conversations.
      48:15 It has not been, it's not a leftover,
      48:17 not forgotten about.
      48:19 I'm just suggesting that in a city like
      48:22 Lakewood, that is a very difficult thing
      48:25 to, you can't just produce one per whatever,
      48:28 right?
      48:29 You know, you guys are doing that project
      48:31 and it's, parking is a tough one.
      48:33 You're the developer and I would expect
      48:35 that you would have thought about that
      48:37 and considered those things and presented
      48:40 at least some options to the administration.
      48:42 Absolutely, we've thought about it.
      48:44 And we think that the parking that's
      48:46 associated with this project, you're going
      48:48 to find it to be enough, particularly
      48:50 with the lot that you already own that
      48:52 has the path, I mean, you walk right to it.
      48:54 So if you decide that you need more parking
      48:57 than this, number one, I don't know that
      48:59 there's a site in Lakewood that's got
      49:01 more parking than we do.
      49:02 So that's going to be even a tougher
      49:04 problem to help solve.
      49:05 I could be wrong, but I doubt it.
      49:07 So the solution to that, if it's one
      49:09 per whatever and we don't have enough,
      49:11 is structured parking, which is about
      49:13 $35,000 a space.
      49:15 That was the next question.
      49:17 It's expensive.
      49:18 But compared to any other alternative
      49:20 that I know of, and one of the
      49:22 reasons we like Cozumel is we're one
      49:24 of the only restaurants in town that
      49:26 has parking around it like that.
      49:28 It's tough.
      49:29 But I think when you have an opportunity
      49:32 to look at it, we absolutely have spent
      49:34 a lot of time on parking.
      49:36 It's one of the reasons that we think
      49:38 that not doing the historic tax credit
      49:40 program while addressing those
      49:42 historic issues is better not to do it.
      49:44 It's because you can get more parking.
      49:46 If we could pick up a few more,
      49:48 that's great.
      49:50 We can design and show you a
      49:52 structured parking on this.
      49:54 If we could add the spots to it,
      49:56 that's one of those things you
      49:58 could come back and say, yeah,
      50:00 we want to see it.
      50:02 Yeah, no, I was not necessarily,
      50:04 actually that was the question.
      50:06 Thank you for throwing out
      50:08 the structured parking, if there would
      50:10 be structured parking, but I do think
      50:12 that parking is important to residents
      50:14 and it will be important to
      50:16 the employees, I think.
      50:20 It is, and I also heard from
      50:22 residents who live in the, around
      50:24 the area that were concerned about that, but
      50:26 Director Barrington, you had something to add.
      50:28 Thank you, Councilwoman Keppel.
      50:30 We'll address anything.
      50:32 So parking absolutely
      50:34 was considered, one of the mayor's
      50:36 concerns with this property is the lack
      50:38 of parking, so it was something that was
      50:40 considered from the beginning.
      50:42 We did do an analysis
      50:44 which we can present at the next meeting
      50:46 in regard to how many visitors for a
      50:48 department, you guys had suggested that, we thought it was a good
      50:50 idea and we did it, so we can,
      50:52 that should be in the file, but we'll
      50:54 put it within our presentation
      50:56 and talk about the parking.
      50:58 What needs to be determined yet is exactly
      51:00 how many spaces we want to leave to just
      51:02 be public parking spaces, and
      51:04 if there's a need for any of the staff to
      51:06 move to another lot, I mean, that
      51:08 might happen.
      51:10 It might be necessary,
      51:12 but number one is the residents
      51:14 and their availability to be able to park and get
      51:16 into the, get into buildings.
      51:18 But we'll provide that information, number
      51:20 of employees, number of parking spaces,
      51:22 and the number of
      51:24 visitors to City Hall at the next
      51:26 meeting. Thank you. Can you also, I
      51:28 think I saw, there were a couple
      51:30 of the door counts were in the folder, but I'm not sure
      51:32 all of them were, so if you can add that,
      51:34 if it's not in there, please add that.
      51:36 And then, I do have a question, so
      51:38 yeah, okay,
      51:40 can I, let me follow up on this because it's related.
      51:44 How many of these parking spaces,
      51:46 because I see the ones that are behind the
      51:48 north building, and I know that
      51:50 the Quilting Bee, that was part of their moving
      51:52 there so they could have parking, so how many of these
      51:54 would be reserved for the
      51:56 customers of the north building?
      52:00 Well, that would, we could have that
      52:02 conversation. I don't think that
      52:06 I don't know that any of those are reserved for
      52:08 Quilting Bee in the back,
      52:10 maybe some along the side, and I
      52:12 know that there might be the ones
      52:14 that kind of go into the smaller building,
      52:16 you know, in the back there you could see, those are
      52:18 probably reserved.
      52:20 Some of the spots on this
      52:22 chart would also be used by
      52:24 the customers visiting the north
      52:26 building? Correct, right. Okay.
      52:28 So the parking that we really
      52:30 need for the north building is the
      52:32 parking on the east, you know,
      52:34 the front of the building and along the side there,
      52:36 which is more than
      52:38 enough for us, and
      52:40 evenings, there's nobody there, so that's
      52:42 going to be overflow for you, things like
      52:44 that would happen, you know, that, people will park
      52:46 and their visitors will park there if they're coming
      52:48 to an evening meeting or weekends or something like
      52:50 that. Okay, and then when
      52:52 the, with the interviews with the staff,
      52:54 were they asked,
      52:56 when we asked about work styles, were
      52:58 they asked if, about their ability to
      53:00 work from home and if they would like to?
      53:02 And then
      53:04 did we offer any,
      53:06 because I know the concerns about parking here,
      53:08 have we offered any incentives for people
      53:10 to take alternate transportation?
      53:14 So I'll go first
      53:16 and whoever can jump in. I'm not aware of
      53:18 any incentives
      53:20 to use alternative means of transportation.
      53:22 I do know that
      53:24 specifically within my department, and I'm sure
      53:26 some others also, we do
      53:28 provide the ability for a flexible
      53:30 schedule so they can work from home
      53:32 sometimes. We just want to make sure that the office
      53:34 is covered and that we are meeting together
      53:36 as a department to be able to, you know, run
      53:38 the department sufficiently, but there are
      53:40 many employees that take advantage of that
      53:42 flexibility.
      53:44 Thank you. I just
      53:46 want to make a comment about the working from home.
      53:48 Where it sounds
      53:50 wonderful, we are mainly
      53:52 a public service,
      53:54 public resident service
      53:56 industry.
      53:58 And so for example,
      54:00 income tax, finance,
      54:02 building department, you can imagine
      54:04 none of those employees could
      54:06 could generally work from home.
      54:08 Once in a while,
      54:10 yes, like myself,
      54:12 but the rest of, you know, especially
      54:14 income tax, vitals, water,
      54:16 the residents all expect people
      54:18 to be here for that. Yeah, and of course
      54:20 public works needs to be in the snowplows.
      54:22 So a very small number, I would
      54:24 imagine. Yeah, I would just like to have those numbers.
      54:26 Councilman, did you have another
      54:28 question? Yes, I did. Thank you, Madam Chair.
      54:30 And actually you asked
      54:32 additional questions that I was
      54:34 leaning towards, but I want to go back
      54:36 to the interviews
      54:38 and the data, and
      54:40 do you actually have
      54:42 that data? Do you have
      54:44 transcripts of the interviews, or
      54:46 is this more collective
      54:48 memory of that
      54:50 you went through the process and asked these
      54:52 questions? Like, is there actually
      54:54 written data? Yeah, I think
      54:56 that's what Madam Chair was asking
      54:58 about, too. There would have
      55:00 so Drew would have done those
      55:02 physical interviews himself, and he wasn't
      55:04 going to keep those to memory. I mean, that's
      55:06 a process, right? It's just like
      55:08 we're going to build you a house, and we sit
      55:10 down and talk to you. So I'm sure that
      55:12 we have notes that we took to do
      55:14 that, and
      55:16 again, this process
      55:18 of finding out whether or not this is a great idea
      55:20 or not, and we're happy to
      55:22 talk to you about it and show you that stuff.
      55:24 Whether it's a report to ourselves
      55:26 in reportable form
      55:28 probably could be done, but I'm sure
      55:30 it's notes.
      55:32 It's not,
      55:34 there's no magic to it,
      55:36 but there has to be notes, otherwise
      55:38 we wouldn't have been able to get to this point.
      55:40 Yes, I mean
      55:42 not always necessarily. It can be
      55:44 you just remember qualitatively
      55:46 you've processed it in your mind,
      55:48 you're able to put it back there.
      55:50 I'm just saying we're not really that smart.
      55:52 We wouldn't be able to remember it.
      55:54 I'm giving you too much credit then.
      55:56 You probably are. I'm sure there's notes.
      55:58 No, that's fine.
      56:00 I don't know. It sounds like it's something that
      56:02 perhaps, Madam Chair, that
      56:04 I don't know
      56:06 if we wanted to be involved
      56:08 in the process, if that's something that
      56:10 we could work with Director
      56:12 Barrington and even HR
      56:14 to do
      56:16 that, and it just may be beneficial to
      56:18 do that anyways, aside from this process,
      56:20 because there might be some additional
      56:22 pieces of information that we could get.
      56:24 So it may be something that we may just
      56:26 want to say we own it,
      56:28 but
      56:30 just something to consider.
      56:32 Actually, I would hope that you would
      56:34 feel like we're not just making
      56:36 things up and we'll test as we go.
      56:38 If this is looking
      56:40 like it's a direction you want to go, my point was
      56:42 as we go forward and we're looking at things
      56:44 and questions are asked, there's no bad
      56:46 question.
      56:48 I would hope that we would start, I'm trying
      56:50 to start with everybody
      56:52 in this room is trying to do the right thing for the city.
      56:54 Including us.
      56:56 I actually think what we do
      56:58 for a living is very, very valuable if you
      57:00 do it right. I've been trained
      57:02 that way. So I hope we all
      57:04 start with, we're all trying to do the best thing for
      57:06 the city. That means everything's shared
      57:08 and we go along. So in the meantime,
      57:10 I would say
      57:12 trust us, this has done
      57:14 pretty good, unless something's changed.
      57:16 You want to verify things,
      57:18 that's all fine.
      57:20 But in normal course of conversation
      57:22 and moving along, that's all
      57:24 great.
      57:26 If we have to prove ourselves
      57:28 to you, we're happy to do what we've done before.
      57:30 I want to
      57:32 go back to a little bit, the work from home.
      57:36 I may know the answer to this, but just from
      57:38 your experience, you said there isn't a
      57:40 strong office market
      57:42 anymore. Can you speak to that a little bit
      57:44 and why there isn't as strong of an office
      57:46 market?
      57:48 Well, it depends on
      57:50 where you are, number one.
      57:52 Downtown Cleveland versus
      57:54 Lakewood. I think Lakewood's got a leg
      57:56 up. I think we're better than downtown
      57:58 Cleveland. And I don't
      58:00 bring data with me. If I'm going to speak to
      58:02 something like that directly,
      58:04 it'll be data. So most of what I'm
      58:06 saying to you is intrinsic in the general
      58:08 sense of the word.
      58:10 So I think there's a lot of data
      58:12 about how bad office...
      58:14 Now, you're also hearing things about it's coming
      58:16 back in Sherwin-Williams, but that's downtown
      58:18 Cleveland. In Lakewood,
      58:20 you know, I know the rents that we were able
      58:22 to achieve and what we did in the North
      58:24 Building. And if that building, you know,
      58:26 ten years ago were in Manhattan,
      58:28 it's all...
      58:30 Right?
      58:32 I guess the better question would be to ask Angie
      58:34 how many people are calling for
      58:36 office space in Lakewood, Ohio right now.
      58:38 That's better data than I could give you.
      58:40 My sense of it is
      58:42 it takes a little longer than you
      58:44 would have expected relative
      58:46 term, right? This isn't data again, but it's
      58:48 been taking a little longer and you don't get
      58:50 quite as much rent as you might have. That's all
      58:52 supply and demand.
      58:54 You know, now the
      58:56 supply side is another good question,
      58:58 right? If we put a Class A office building
      59:00 here, could we attract people to it?
      59:02 I'm optimistic
      59:04 about that, but if I have to write the
      59:06 $16 million check to do it, that's a big
      59:08 bet. You know?
      59:10 A round stone would have been...
      59:12 You know, we tried to get a round stone here
      59:14 and they wanted more space than we could
      59:16 accommodate. So
      59:18 you don't see that very often.
      59:20 That's pretty unique. At least
      59:22 so far. But I think Angie might be able
      59:24 to answer that question better than I could.
      59:26 Dr.
      59:28 Barrington.
      59:30 I don't know that I can answer the question better, but I will say
      59:32 that I don't get a lot of calls for office space.
      59:34 It's primarily service, retail,
      59:36 that kind of industry,
      59:38 not office.
      59:40 Thank you.
      59:42 Thank you,
      59:44 Chair.
      59:46 And thank you, everyone,
      59:48 for presenting.
      59:50 So I'll talk
      59:52 first to kind of the development team and then more
      59:54 on process.
      59:56 The first thing is, I know this is
      59:58 one of the earliest buildings in Lakewood, but why isn't it
      1:00:00 90? Like, why is it
      1:00:02 off-center on the site?
      1:00:04 Was it just like
      1:00:06 when they laid the foundation, they didn't do it right?
      1:00:08 This is more of a design
      1:00:10 question, because I look at this map and there is no
      1:00:12 you know what I'm saying?
      1:00:14 Do you see what I'm saying, though? Do you know
      1:00:16 why, or is that just?
      1:00:18 Okay. All right. Thank you
      1:00:20 for humoring me.
      1:00:22 Because you do the math, right, when you lay
      1:00:24 the footers. Whatever. So
      1:00:26 second thing is, and this is where
      1:00:28 I talk about
      1:00:30 city folks,
      1:00:32 I think there's a way
      1:00:34 to make this development agreement thing
      1:00:36 work. I think in a minimum
      1:00:38 the city would need an owner's rep.
      1:00:40 It would need
      1:00:42 some sort of design representation.
      1:00:44 Because these people are true professionals
      1:00:46 and you're good at your jobs, but
      1:00:48 you're not under
      1:00:50 contract with us in a way that reports to us.
      1:00:52 You don't have the duty of a client service
      1:00:54 and kind of professional
      1:00:56 liability. And so that's
      1:00:58 where we talked about project
      1:01:00 delivery. Not impugning
      1:01:02 your professionalism, just you have a client
      1:01:04 and your client would be Liberty, not the city of
      1:01:06 liquid. It would be the city of liquid through
      1:01:08 privity, but in reality we want someone to report to us.
      1:01:10 The next
      1:01:12 thing I'm curious about is, and we went
      1:01:14 through this costing exercise with
      1:01:16 Weber Murphy Fox and PMC,
      1:01:18 we had limited data.
      1:01:20 Limited, you know, so in construction
      1:01:22 and design,
      1:01:24 risk is money.
      1:01:26 And so unknowns are risks.
      1:01:28 But some of the things that came up when
      1:01:30 we talked about it was
      1:01:32 the roof, the foundation,
      1:01:34 and the basement.
      1:01:36 And so, and then HVAC
      1:01:38 generally.
      1:01:40 I'm assuming on the roof
      1:01:42 I guess maybe it's in decent
      1:01:44 shape. I walked this building, I didn't see any
      1:01:46 water in it, but if we're talking
      1:01:48 about 50 years of useful life from
      1:01:50 point A to forward,
      1:01:52 where's that at? To the
      1:01:54 basement, the only report the city has
      1:01:56 in its name is a phase one ESA. It says there's some
      1:01:58 moisture mold in the basement.
      1:02:00 Which is not
      1:02:02 the worst thing, but it just needs to be addressed.
      1:02:04 And so curious as to what
      1:02:06 kind of we're thinking here.
      1:02:08 And then
      1:02:10 the HVAC,
      1:02:12 I mean, you see a bunch of units hanging
      1:02:14 out of windows in this building. It looks
      1:02:16 like it was slapdash with duct tape
      1:02:18 kind of put together. So I'm assuming
      1:02:20 there'd be a more, you know, I don't even
      1:02:22 know where you put an air handler, right, or
      1:02:24 boiler. What are you doing? So can you walk
      1:02:26 through those three big building
      1:02:28 components and then kind of what
      1:02:30 the high level plan is for them?
      1:02:34 Yeah, so start at the top.
      1:02:36 The roof we have planned on
      1:02:38 putting a new shingled roof on.
      1:02:40 The pitched areas and
      1:02:42 a new EPDM or TPO
      1:02:44 roof on the flat areas.
      1:02:46 Those warranties I think from the manufacturers
      1:02:48 will get you 30 years.
      1:02:50 I don't know that you're going to find a 50 year warranty
      1:02:52 on any of those. Related
      1:02:54 to the moisture in the basement,
      1:02:56 we have included along the
      1:02:58 eastern edge, north end
      1:03:00 waterproofing. So we're going to excavate and
      1:03:02 dig up and do any of the
      1:03:04 waterproofing on those foundation
      1:03:06 walls that we do know there are moisture
      1:03:08 issues with. And
      1:03:10 along those lines we're also going to take care
      1:03:12 of the downspout piping that
      1:03:14 right now is pretty non-existent.
      1:03:16 But we have included,
      1:03:18 you know, the monies associated
      1:03:20 with that. And then
      1:03:22 HVAC system, we're going to be
      1:03:24 putting, you know, forced air units in here.
      1:03:26 So you're not going to have a singular
      1:03:28 air handler unit
      1:03:30 that, you know, is going to be
      1:03:32 20 feet by 15 feet wide. It's going to be
      1:03:34 multiple split systems
      1:03:36 broken up by what we've been thinking
      1:03:38 right now is going to be area. So every
      1:03:40 department area on the floor plans
      1:03:42 is going to have their own thermostat control.
      1:03:44 And those are going to be
      1:03:46 isolated to the floor plans themselves
      1:03:48 based on the zone. So
      1:03:50 you're not going to have large boilers, coolers,
      1:03:52 chillers or air handlers
      1:03:54 to service those.
      1:03:58 Thank you. So you're
      1:04:00 thinking that it would just be excavation
      1:04:02 for the basement issue of one
      1:04:04 of the walls. You don't think it's an issue that
      1:04:06 would require? It's not, yeah, it's not around all
      1:04:08 of the walls. One of the walls will have
      1:04:10 some structural repointing done to it. But
      1:04:12 they're
      1:04:14 75% of that basement is dry
      1:04:16 as you even walk it today.
      1:04:18 And so what would be, you know,
      1:04:20 we saw the first, and perhaps this is the design
      1:04:22 question, maybe a construction question.
      1:04:24 What's kind of the high level spec
      1:04:26 for the basement space?
      1:04:28 We see lots of build out
      1:04:30 and fit for the first and second floor.
      1:04:34 So you can speak to that. But I don't think we, did we include
      1:04:36 the, yeah, you don't have
      1:04:38 the lower level on this plan.
      1:04:40 And I don't think it's
      1:04:42 usable space. Half of the basement
      1:04:44 was used by the Board of Ed for decades.
      1:04:46 Higher ceilings and windows and all that.
      1:04:48 This is,
      1:04:50 this includes
      1:04:52 doing everything, but I think it's about
      1:04:54 22,000 square feet of second,
      1:04:56 first and second floor space.
      1:04:58 I don't know that we've programmed
      1:05:00 the basement for people just yet.
      1:05:02 Although it really could be
      1:05:04 used, like I said, for decades.
      1:05:06 It is finished? Not from
      1:05:08 a program space. But
      1:05:10 the basement floors are going to be, you know, leveled.
      1:05:12 So it's not, right now you kind of walk in there
      1:05:14 and it's got some ups and downs.
      1:05:16 It's going to be a storage space, but it is,
      1:05:18 the elevator will access the basement.
      1:05:20 It's going to be, you know, power, heated, cooled,
      1:05:22 and some IT components will be down there.
      1:05:24 But there is
      1:05:26 plenty of space for storage and any other,
      1:05:28 you know, admin needs.
      1:05:30 But it is going to be habitable.
      1:05:32 Elevator, access,
      1:05:34 all of it.
      1:05:36 And some of that is tied back
      1:05:38 to some of the conversations with the departments.
      1:05:40 Some departments are pretty
      1:05:42 paper heavy, while others are going more
      1:05:44 electronic. So that's part of the
      1:05:46 basement.
      1:05:50 Thank you. And this is more
      1:05:52 of a
      1:05:54 broad question. I, you know,
      1:05:56 for the
      1:05:58 administration.
      1:06:00 And thank you.
      1:06:02 The people that are assembled here
      1:06:04 can do this project, they can do it well.
      1:06:06 I have no
      1:06:08 personal taunts about that.
      1:06:12 The question I need more help
      1:06:14 answering for myself
      1:06:16 and for the public is
      1:06:18 whether the city needs to do
      1:06:20 this, right? If this is the
      1:06:22 answer to our problems.
      1:06:24 And the analysis to get us there.
      1:06:28 And then some of the more nuanced
      1:06:30 questions that my colleagues are asking
      1:06:32 about parking and access and those
      1:06:34 types of things I think are very important.
      1:06:36 I do think they're a little bit further
      1:06:38 down the line than maybe some of
      1:06:40 was given some steps.
      1:06:42 So from my perspective, you know, and I
      1:06:44 said it last week, right?
      1:06:46 We're getting 12,000
      1:06:48 or 8,000, 12,000
      1:06:50 some
      1:06:52 four or five
      1:06:54 Lakewood houses of more office
      1:06:56 space than we have right now for
      1:06:58 admin staff.
      1:07:00 In a world in which, you know,
      1:07:02 square foot per employee seems
      1:07:04 to be going down in municipal
      1:07:06 and office worlds.
      1:07:08 So some
      1:07:10 analysis and kind of
      1:07:12 understanding on that
      1:07:14 point would be very helpful.
      1:07:16 Secondly, I know Director Mahoney has
      1:07:18 expressed concern about
      1:07:20 the annex across the street
      1:07:22 and how some employees maybe don't have
      1:07:24 great space there and
      1:07:26 they're also disconnected. I do think
      1:07:28 that, you know,
      1:07:30 I think it's like 60 to 70
      1:07:32 percent of the business city hall
      1:07:34 go there for income
      1:07:36 tax or water purposes. So there is
      1:07:38 a little bit of a benefit of kind of a
      1:07:40 quick in quick out, you know,
      1:07:42 there, although it does create maybe some staff
      1:07:44 disjointed things because they're across
      1:07:46 the street. But I'm just saying it's not
      1:07:48 all negative. There is some positive to it
      1:07:50 in my perception.
      1:07:52 So I think
      1:07:54 I think
      1:07:56 I'd like to see more analysis
      1:07:58 of why we need
      1:08:00 to move.
      1:08:02 And like I said last time, I think 13,000
      1:08:04 square feet for police
      1:08:06 is that
      1:08:08 more than we need? Is that less than we need?
      1:08:10 I have no frame of reference to know
      1:08:12 what that is, right?
      1:08:14 There are
      1:08:16 some charts about
      1:08:18 square foot per officer
      1:08:22 that are persuasive, but I don't
      1:08:24 know what kind of, you know, there's
      1:08:26 accreditation organizations for law enforcement,
      1:08:28 CALEA and other ones that probably have
      1:08:30 some analysis and understanding. This is
      1:08:32 where I think that the city could benefit, the district could benefit
      1:08:34 from some professional
      1:08:36 third-party verifiable
      1:08:38 approaches that they could give
      1:08:40 us kind of a good analysis of those things.
      1:08:42 And that's where I'm at, where I
      1:08:44 feel like
      1:08:46 that type of information
      1:08:48 would be very persuasive
      1:08:50 to help me understand
      1:08:52 how to do what's best for
      1:08:54 Lakewood residents and how we spend their money
      1:08:56 to make sure that
      1:08:58 staff are in
      1:09:00 comfortable workspaces
      1:09:02 that a lot of them do their job well
      1:09:04 and that, you know, enable us to
      1:09:06 recruit qualified people.
      1:09:08 But I feel a little bit
      1:09:10 blind in that respect.
      1:09:12 And I'm just being honest. So
      1:09:14 I do think there's a way to work
      1:09:16 with these folks and make this project work.
      1:09:18 I just don't know if we need to do this project.
      1:09:20 And that's what I, that's where I'm at.
      1:09:22 I guess that's what I'm saying.
      1:09:24 Thank you.
      1:09:26 I don't want to,
      1:09:28 we've got about 15 minutes,
      1:09:30 so I want to make sure we get to
      1:09:32 other councilmembers. I see councilmember
      1:09:34 Bixensee has a question.
      1:09:36 Thank you, Madam Chair. Thank you for your presentation
      1:09:38 this evening.
      1:09:40 In kind of a similar vein to
      1:09:42 Council Vice President Baker.
      1:09:44 You know, it's difficult to predict
      1:09:46 what a city hall will look like
      1:09:48 a couple decades from now.
      1:09:50 But, you know, certainly you could
      1:09:52 speculate that there'll be reduced administrative
      1:09:54 space needs
      1:09:56 in more hybrid, in more hybrid environment
      1:09:58 that's blending in-person services with
      1:10:00 more digital access and
      1:10:02 perhaps increased public engagement.
      1:10:04 I've heard it said that
      1:10:06 the City Hall of the Future could be
      1:10:08 operate more like a community living room.
      1:10:10 So in that vein,
      1:10:12 you know, in a city like Lakewood where
      1:10:14 we don't have a particularly large
      1:10:16 amount of public gathering
      1:10:18 spaces, particularly indoor
      1:10:20 public gathering spaces,
      1:10:22 you know, is it possible
      1:10:24 down the road, you know,
      1:10:26 could this space be
      1:10:28 adaptable to the extent that
      1:10:30 there are convertible rooms
      1:10:32 and convertible space so that
      1:10:34 you know, if there was less
      1:10:36 administrative space needs down the
      1:10:38 road, you could
      1:10:40 devote some more space to
      1:10:42 cultural events and workshops
      1:10:44 and public meetings and civic celebrations
      1:10:46 and, you know, perhaps even private
      1:10:48 functions like weddings.
      1:10:50 Is that sort of adaptability something that's
      1:10:52 being thought of with this design?
      1:10:56 Now you sound like me.
      1:10:58 If I owned it.
      1:11:00 That's exactly what I ask myself.
      1:11:02 And before I get to that
      1:11:04 I think Councilman Baker
      1:11:06 that was, you're right,
      1:11:08 you should know why you're doing it.
      1:11:10 So back to your
      1:11:12 question, the infrastructure
      1:11:14 that would be put in this building
      1:11:16 will help it survive another hundred
      1:11:18 years. This
      1:11:20 building has a lot of opportunity
      1:11:22 if you wanted to do something
      1:11:24 different with it, like even tearing down
      1:11:26 some walls and making some changes
      1:11:28 to still be a fabulous
      1:11:30 building in the center of town.
      1:11:36 You could, once it's
      1:11:38 improved and you've
      1:11:40 got the HVAC running in it, whatever,
      1:11:42 it's kept up as a great building.
      1:11:44 Absolutely
      1:11:46 this could be public space
      1:11:48 if you got rid of the demising walls.
      1:11:50 I mean,
      1:11:52 from my perspective, the yoga studios,
      1:11:54 the restaurant, housing,
      1:11:56 there's a lot of things that can be done in this building.
      1:11:58 It's designed, and I think about it
      1:12:00 in terms of the Taco Bell, right?
      1:12:02 The Taco Bell effect is a Taco Bell is a Taco Bell.
      1:12:04 It's always going to be a Taco Bell.
      1:12:06 This building was built a hundred years ago
      1:12:08 and a hundred years from now with the right improvement
      1:12:10 in it. It could stand and it
      1:12:12 could be, it's a fairly
      1:12:14 efficient box.
      1:12:16 So
      1:12:18 do I think that it would, if you didn't
      1:12:20 think about the fact that it goes empty?
      1:12:22 I don't think that.
      1:12:24 I don't know that office is necessarily
      1:12:26 maybe a hybrid.
      1:12:28 If I did apartments in here,
      1:12:30 maybe I would put my office in there.
      1:12:32 They could fit together. But you're thinking,
      1:12:34 and I think about that, one other thing,
      1:12:36 one of my best friends is a very
      1:12:38 successful
      1:12:40 private equity guy in
      1:12:42 IT. Years ago I said
      1:12:44 data center sounds like it's going to be a big deal.
      1:12:46 And he said, you know what?
      1:12:48 As long as it's small, you'll never need a data center.
      1:12:50 What a mistake I made
      1:12:52 listening to him. I didn't get into
      1:12:54 data centers.
      1:12:56 So you just don't know.
      1:12:58 But what I know is that improved
      1:13:00 box, when I say box,
      1:13:02 the exterior walls, is what's important.
      1:13:04 The windows being
      1:13:06 tight.
      1:13:08 I think you probably could answer it better
      1:13:10 than I could. But I feel like
      1:13:12 there's options. And certainly public
      1:13:14 spaces is well located for that
      1:13:16 right in the middle of town. So anyway,
      1:13:18 go ahead, I'm sorry.
      1:13:20 You know, I think this building
      1:13:22 is actually a perfect example of adaptability.
      1:13:24 The building started out as a
      1:13:26 school, converted into
      1:13:28 offices. We're looking at
      1:13:30 changing the office dynamic.
      1:13:32 I think, you know, this building
      1:13:34 lends itself to change.
      1:13:36 They don't build buildings like this.
      1:13:38 These two guys can probably
      1:13:40 talk more about that. But, you know,
      1:13:42 there's brick. There's
      1:13:44 heavy timber tied to this. There's
      1:13:46 stone walls. So this building
      1:13:48 is built for a foreseeable
      1:13:50 future. And I think the adaptability
      1:13:52 of this, you know, is exemplified by
      1:13:54 transition from school to office
      1:13:56 now to city hall
      1:13:58 potentially. And some of the spaces that
      1:14:00 we've created offer some of that
      1:14:02 flexibility and offer some different
      1:14:04 spaces that could be used for a variety of
      1:14:06 different functions.
      1:14:08 You can have meetings there. You can have different
      1:14:10 gathering events in the
      1:14:12 tunda or office parties
      1:14:14 or, you know, different community gatherings.
      1:14:16 So I think there's a lot of opportunity
      1:14:18 and a lot of potential for
      1:14:20 different uses and functions within the space
      1:14:22 even as it's designed.
      1:14:24 Thank you.
      1:14:26 Council Member Evans.
      1:14:28 Thank you, Chair.
      1:14:30 Just a quick comment that
      1:14:32 thank you to all my colleagues for
      1:14:34 the questions. My disconnect on
      1:14:36 this continues to be, and
      1:14:38 in agreement with Councilman Baker on this,
      1:14:40 kind of the, we're really far down the road
      1:14:42 on this. I think, you know, getting into the details
      1:14:44 here, and I'm not
      1:14:46 convinced that this is the overall
      1:14:48 right solution. So that's just what,
      1:14:50 you know, where I'm coming from, where I'm struggling.
      1:14:52 I think this, you're right,
      1:14:54 everything lays out really nice. I'm confident
      1:14:56 we could make this work. I'm just not
      1:14:58 confident that this is the solution.
      1:15:00 So just wanted to put that out there.
      1:15:02 Thank you.
      1:15:04 Council Member Bullock.
      1:15:06 Thanks, Madam Chair.
      1:15:08 Thanks, Mr. Calouris, for
      1:15:10 being here and for
      1:15:12 bringing the design and development team,
      1:15:14 or rather the design and the
      1:15:16 construction team. So it's good to meet all of you.
      1:15:18 And I appreciate the
      1:15:20 in-depth and thoughtful discussion.
      1:15:22 And thanks to the administration for continuing
      1:15:24 to share information and make
      1:15:26 the case. So I just have a couple
      1:15:28 of kind of
      1:15:30 layperson's questions. So on this
      1:15:32 rendering, to understand
      1:15:34 what the design currently is, what's proposed.
      1:15:36 So on this rendering, if I'm looking at it correctly,
      1:15:38 that's a new curb cut from Warren Road
      1:15:40 into the site, and then there's a new
      1:15:42 drive. I think I see a
      1:15:44 sidewalk maintained.
      1:15:46 I know that there's a cut-through
      1:15:48 path that a lot of walk-to-
      1:15:50 school families use
      1:15:52 going from the
      1:15:54 neighborhoods across the way to Grant
      1:15:56 Elementary, which is tucked behind there.
      1:16:00 But so I think
      1:16:02 is this rendering from the main sidewalk
      1:16:04 on Warren?
      1:16:06 Okay. I think the answer is yes.
      1:16:08 And so
      1:16:10 there's kind of a
      1:16:12 on the other slide you showed
      1:16:14 the approximate layout,
      1:16:16 but have you gotten deeply into the
      1:16:18 landscape plan, probably not at this stage?
      1:16:20 Okay. That'd be a future
      1:16:22 step.
      1:16:24 And then I'll just
      1:16:26 we don't have time to go through all my questions,
      1:16:28 but I'll just kind of list rapid fire.
      1:16:30 So
      1:16:32 total square feet,
      1:16:34 is it more, less,
      1:16:36 or the same from
      1:16:38 me looking at the
      1:16:40 renderings that you
      1:16:42 had of the floor plans on both floors?
      1:16:44 It looked to me about the same as the
      1:16:46 current
      1:16:48 city hall offices,
      1:16:50 but I don't
      1:16:52 know measurements and
      1:16:54 I need
      1:16:56 helpful translations of what
      1:16:58 a thousand square feet means versus
      1:17:00 the school building.
      1:17:02 Can you come up to the mic?
      1:17:04 Can you talk to the mic because the recording
      1:17:06 31,000 square feet is what the school
      1:17:08 is currently. Okay.
      1:17:10 And so do we know, or does
      1:17:12 anybody know, maybe the administration,
      1:17:14 you know, so if we were to move forward
      1:17:16 with the project, you've got a new building department.
      1:17:18 Is that the same amount of square feet,
      1:17:20 less square feet, more square feet?
      1:17:22 And so on and so forth
      1:17:24 for the various departments.
      1:17:26 Thank you. Through you,
      1:17:28 Madam President, we're
      1:17:30 just because we just got these plans that
      1:17:32 I actually just got them to be able to do
      1:17:34 the comparison per department. I don't have
      1:17:36 that. But overall, there will
      1:17:38 be more space for administration
      1:17:40 than what is here, but I don't have the
      1:17:42 per department right now. Okay. So
      1:17:44 on the ballpark, is it 10%
      1:17:46 more or 100% more?
      1:17:48 The existing city hall is 28,000 square
      1:17:50 feet on my cheat sheet, and
      1:17:52 this building's about 32, plus an addition.
      1:17:54 35, 36.
      1:17:56 Okay. So you're saying significantly more.
      1:17:58 So I'm saying there's about
      1:18:00 8,000 extra square foot
      1:18:02 in that new building.
      1:18:04 Okay. Thank you. So that
      1:18:06 gives some order of magnitude.
      1:18:08 That includes the end. On my...
      1:18:10 All right.
      1:18:12 That's number one. Number two is
      1:18:14 so the example
      1:18:16 is using the current building commission,
      1:18:18 like an open floor plan. If the next
      1:18:20 building commission doesn't want something else,
      1:18:22 do we have that adaptability
      1:18:24 or it's going to be, you know, we're going to have to
      1:18:26 budget all over again?
      1:18:32 So yes. The way it's currently designed,
      1:18:34 there's plenty of flexibility to add partitions
      1:18:36 or take away partitions.
      1:18:38 Just depends. Our approach
      1:18:40 was to try to give every office
      1:18:42 a window so you get natural
      1:18:44 light, but we can easily flip
      1:18:46 different spaces or open it up.
      1:18:48 So I guess what I'm
      1:18:50 asking is a tricky question.
      1:18:52 How do you future-proof
      1:18:54 your design, which
      1:18:56 the needs may change
      1:18:58 and evolve, et cetera.
      1:19:00 So you can't do that perfectly, but
      1:19:02 if there's some thought to
      1:19:04 that,
      1:19:06 to me, that would
      1:19:08 be prudent.
      1:19:10 So there's different ways
      1:19:12 and approaches. I think the
      1:19:14 way we have it designed now, it's metal
      1:19:16 framing with drywall.
      1:19:18 So it's semi-permanent.
      1:19:20 There's different ways that we can take a look
      1:19:22 at modular partition walls.
      1:19:24 You know, it's just
      1:19:26 a study of STC values,
      1:19:28 sort of sound transmission, creating
      1:19:30 that privacy. So there's a little bit of
      1:19:32 detail. Okay. No, that's fine. I just
      1:19:34 wanted to get your take. And then ADA
      1:19:36 accessibility. I mean, this is an 1899 building.
      1:19:38 Not easy to do,
      1:19:40 but of course we're making
      1:19:42 serious headway, and
      1:19:44 I appreciate the leadership of some of my colleagues
      1:19:46 in the administration on that.
      1:19:48 Are we aiming for 100 percent, or
      1:19:50 some other standard?
      1:19:52 So, a lot of it's going to be
      1:19:54 the entrance into the building. So
      1:19:56 with the new entrance, that's going to be fully accessible.
      1:19:58 We are including a new elevator,
      1:20:00 so that will provide access to
      1:20:02 every floor in the building. So we are going to be
      1:20:04 100 percent
      1:20:06 accessible through the main entrance,
      1:20:08 the new main entrance. Okay, and then there's things like
      1:20:10 the door knob handles, and
      1:20:12 the height of sinks.
      1:20:14 Yeah, so we'll do
      1:20:16 door style handles. We'll do
      1:20:18 sinks, countertops, all in
      1:20:20 accessible height. We're going to do
      1:20:22 clear floor spaces, approaches for
      1:20:24 every door, so that you can meet
      1:20:26 that accessible requirement. Okay, thanks.
      1:20:28 And then
      1:20:30 the last is just to touch on a couple other
      1:20:32 things.
      1:20:34 HVAC, my colleague
      1:20:36 talked a little bit about that. R-value,
      1:20:38 standby power. Those are non-trivial
      1:20:40 considerations. I'm an energy
      1:20:42 policy guy
      1:20:44 and I've been in the
      1:20:46 industry for a long time.
      1:20:48 We have a climate action plan.
      1:20:50 It would be tough
      1:20:52 from my perspective for us to
      1:20:54 invest a significant amount of capital
      1:20:56 and then not be
      1:20:58 living by the
      1:21:00 They have a term called malinvestment
      1:21:02 where you spend a bunch of money
      1:21:04 that you're not going to get back.
      1:21:06 And then after it's built
      1:21:08 a couple years later, you realize, hmm,
      1:21:10 we didn't do the design or the standard,
      1:21:12 the efficiency and
      1:21:14 low carbon design.
      1:21:16 That's a big deal
      1:21:18 for me at least. I think
      1:21:20 a significant amount of our community
      1:21:22 cares about it and it's also something we call for in the plan.
      1:21:24 I know that's a whole extra
      1:21:26 layer of standard to meet.
      1:21:28 Is that part of what we
      1:21:30 discussed so far or is that something
      1:21:32 to be discussed in the future?
      1:21:34 No, those are all factors that are considered
      1:21:36 and incorporated. So even in the building
      1:21:38 next door, continuous insulation,
      1:21:40 rigid insulation around all the exterior walls,
      1:21:42 new ceiling insulation,
      1:21:44 just that
      1:21:46 continuous insulation on the outside
      1:21:48 and the envelope to these old brick
      1:21:50 buildings adds a great deal of
      1:21:52 energy efficiency.
      1:21:54 It's a job of work too, right?
      1:21:56 As any owner of a wooden frame
      1:21:58 100-year-old Lakewood home knows.
      1:22:00 Yeah. Okay.
      1:22:02 That's important and I appreciate the
      1:22:04 attention to that. So thank you
      1:22:06 for the
      1:22:08 communication on this and I'm sure there's more to
      1:22:10 talk about but thank you for being
      1:22:12 here.
      1:22:14 Thanks. Okay. We are
      1:22:16 coming up on time.
      1:22:18 Council members, final
      1:22:20 questions.
      1:22:22 So moving forward, so
      1:22:24 next week we
      1:22:26 really only have an hour because
      1:22:28 we do have finance committee following
      1:22:30 committee of the whole.
      1:22:32 So we'll try to get through
      1:22:34 as much as we can. Please continue to send
      1:22:36 questions, like there were a lot of good
      1:22:38 topics brought up tonight,
      1:22:40 things that you'd like the administration to cover
      1:22:42 either at that time
      1:22:44 or in writing to you.
      1:22:46 I'll just add one final
      1:22:48 thing for me is
      1:22:50 when the mayor
      1:22:52 called to say that due to
      1:22:54 scheduling that this part would come first and then
      1:22:56 we'll do that other part next
      1:22:58 week, it's a little backwards into Vice President
      1:23:00 Baker's point of
      1:23:02 being this far down in design
      1:23:04 before we've actually
      1:23:06 gotten
      1:23:08 really understood
      1:23:10 whether this is the
      1:23:12 solution to our space
      1:23:14 bombs with the police.
      1:23:16 To that point I would love to see
      1:23:18 what work has been done on
      1:23:20 what the
      1:23:22 renovation here would look like for the police
      1:23:24 since that's our main reason
      1:23:26 for exploring this.
      1:23:28 So that's something I'm hoping to see
      1:23:30 as well.
      1:23:32 With that we are about out of time. Thank you all
      1:23:34 for being here and speaking with us
      1:23:36 and we'll take
      1:23:38 a quick break
      1:23:40 and reset for full council.
      1:23:42 With that, no further business before Community of the Whole
      1:23:44 without objection we're adjourned.